Duration
Description
Scope:• Mechanical, Piping and Steel Works• Mechanical Piping, Steel Structure and Tank Installation• End to End Scaffold Erection Work Scope under SLE. Piping Volume 17K diameter inches.
11 Months
Location
Jurong Island