top of page

Duration

Duration

Flare Tip Stack Replacement Works

Description

Scope:
• Dismount Flare Tip and Installed New Flare and Corresponding Flare Stacks more than 100 meters above ground​
• End to End Piping Works: Replaced and Installed more than 900 meters worth of Pipes (30” in diameter). Scope includes Pipe Fabrication (in-house) to Site Installation

Duration

20 Days

Location

Jurong Island

bottom of page