top of page
Duration
Duration
Flare Tip Stack Replacement Works
Description
Scope:
• Dismount Flare Tip and Installed New Flare and Corresponding Flare Stacks more than 100 meters above ground
• End to End Piping Works: Replaced and Installed more than 900 meters worth of Pipes (30” in diameter). Scope includes Pipe Fabrication (in-house) to Site Installation
Duration
20 Days
Location
Jurong Island
1/2
bottom of page