Stainless Tank Fabrication
Project Duration: 15 months
Peak No of Field Personal: 30
Location: STP
20ft stainless tank pre-fabrication and installation, plus demolition and removal of existing old tank, and scaffold erection. STP's first offsite pre-fab tank delivered via sea barge. Offloaded by a 1500T barge crane and transported to laydown area via heavy duty hydraulic trailer.